HELEKTOR S.A. was awarded the construction of the Western Macedonia integrated solid waste management facility. Within this scope there were numerous industrial building including trusses of over 35m, tapered member buildings, hoppers, silos and secondary constructions.

 

METEKO carried out the fabrication (including fireproofing with intumescent paints) and installation of all buildings, including a 500tn execution class 3 (EXC3) building according to EN1090.

  • Client

    HELEKTOR S.A.

  • Year completed

    2016

  • Budget

    2.900.000€